
On May 6, Hut 8 announced its 1 GW Beacon Point AI data center campus in Texas would proceed with a 15-year lease covering 352 MW of IT capacity, with Vertiv named as a Tier 1 counterparty alongside American Electric Power and Jacobs. The site will be designed around NVIDIA's DSX reference architecture for gigawatt-scale AI infrastructure.
On April 27, Vertiv acquired Strategic Thermal Labs, a specialist in advanced liquid-cooling technologies, to strengthen engineering capability around cold-plate design, server-side liquid cooling, and high-density thermal validation for AI and high-performance computing workloads.
In Q1 2026, Vertiv reported net sales of $2.65 billion, up 30% year over year. The Americas region grew 44% organically, driven by strong data-center demand.
Ask the AI about this article →
AI-summarized, only the topics you pick — one digest a day via Email, Slack, or Discord.
Free · takes 30 seconds · unsubscribe anytime
Ask AI anything about this article. Q&As are published on this page for other readers too.