AIToday

SK Group, NVIDIA sign $500B+ AI partnership spanning factories and memory

Top Companies AI — US (1/2)2h ago
SK Group, NVIDIA sign $500B+ AI partnership spanning factories and memory

Key takeaway

SK Group and NVIDIA have announced a $500-billion-plus partnership to build AI infrastructure in South Korea, with SK Telecom constructing a 2-gigawatt AI Cloud expected to launch in 2027 and SK hynix securing a long-term memory-supply deal to codevelop next-generation AI chips including HBM. The initiative aims to position South Korea as a global AI powerhouse serving Asia-Pacific demand while helping SK companies scale capital-intensive AI infrastructure for a broader customer base.

Summaries like this, in your inbox every morning.

Sign up free →

3 Key Points

  • What happened

    SK Group and NVIDIA announced a $500-billion-plus strategic partnership on July 24, 2026, with SK Telecom planning to build a 2-gigawatt AI Cloud in Korea using NVIDIA's DSX platform and Vera Rubin accelerated computing, expected to come online in 2027, while SK hynix entered a long-term AI memory partnership with NVIDIA to codevelop next-generation memory including HBM.

  • Why it matters

    The deal cements South Korea's position in global AI infrastructure by combining SK Telecom's data-center scale with SK hynix's chip-manufacturing leadership and NVIDIA's computing platform, allowing SK Telecom to expand large-scale AI infrastructure and make it available to more customers, and helping Korea transition from an AI adopter to an AI innovation hub that can serve Asia-Pacific demand.

  • What to watch

    The first AI factory is scheduled to come online in 2027, and the partnership will jointly address AI demand across the Asia-Pacific region, including sovereign, physical, agentic, and enterprise AI services.

In Depth

On July 24, 2026, SK Group and NVIDIA announced a $500-billion-plus comprehensive partnership spanning AI factory construction and AI memory supply, signaling a deepening strategic alignment between the South Korean conglomerate and the American AI computing leader. The two sides signed letters of intent to formalize the agreement, building on decades of prior technology partnerships.

The cornerstone of the deal is SK Telecom's commitment to build a 2-gigawatt AI Cloud in Korea using NVIDIA's DSX platform and NVIDIA Vera Rubin accelerated computing hardware, with memory supplied by SK hynix's HBM4 chips. The facility is planned to come online in 2027 and will be built on NVIDIA's DSX full-stack AI factory architecture, which integrates NVIDIA accelerated computing, systems, software, and partner technologies to deliver what the companies describe as the lowest token cost at maximum energy efficiency. In parallel, SK hynix is entering into a long-term AI memory partnership with NVIDIA to codevelop and optimize next-generation AI memory solutions, including HBM, to meet evolving demands ranging from large language model training to agentic AI and physical AI applications.

SK Group Chairman Chey Tae-won framed the partnership as a path for Korea to transcend its role as a leading AI adopter and become a global hub driving AI innovation, leveraging SK hynix's AI memory and SK Telecom's infrastructure capabilities. NVIDIA founder and CEO Jensen Huang echoed this positioning, stating that "South Korea has all the ingredients to become a global AI powerhouse — world-class networks and data centers, leadership in chip technology and vast industrial scale." The two companies aim to jointly accelerate large-scale AI infrastructure development and address increasing AI demand across the Asia-Pacific region, including applications in sovereign, physical, agentic, and enterprise AI services.

Context & Analysis

SK Group's partnership with NVIDIA represents a major commitment to making South Korea a hub for AI infrastructure rather than merely a consumer or adopter of AI technology. The collaboration links three complementary capabilities: SK Telecom's existing data-center and cloud-services expertise, SK hynix's foundry-level chip design and memory manufacturing (HBM4), and NVIDIA's computing platform and accelerator architecture. By anchoring a 2-gigawatt facility to launch in 2027, the companies are signaling a multi-year, capital-intensive bet on serving both local Korean demand and the wider Asia-Pacific region.

The partnership also addresses a structural constraint in AI infrastructure: SK hynix gains a committed, long-term customer for next-generation memory, while NVIDIA secures stable supply of the memory chips essential to its inference and training systems. SK Telecom, meanwhile, can offer cloud customers access to cutting-edge compute infrastructure at scale without bearing all capital risk alone. The combination of on-site memory manufacturing (SK hynix) and cloud deployment (SK Telecom) on a single platform (NVIDIA DSX) is intended to minimize token cost and energy consumption—metrics that matter to cloud operators facing rising power constraints.

FAQ

When will the AI factory come online?
The first AI factory is planned to come online in 2027.
What technology will power SK Telecom's AI Cloud?
The cloud will use the NVIDIA DSX platform and deploy NVIDIA Vera Rubin accelerated computing powered by SK hynix HBM4.
What is the scale of SK Telecom's AI Cloud?
SK Telecom is building a 2-gigawatt-scale AI Cloud in Korea.

Get the latest AI Stocks & Markets news every morning

AI-summarized, only the topics you pick — one digest a day via Email, Slack, or Discord.

Free · takes 30 seconds · unsubscribe anytime

Discussion

No comments yet. Be the first to share your thoughts!

Log in to join the discussion

Related Articles

Stay ahead with AI news

Get curated AI news from 200+ sources delivered daily to your inbox. Free to use.

Get Started Free

Free · takes 30 seconds · unsubscribe anytime